15/11/2015
The Water and Sewage Treatment Facility (SAAE) and the City Hall of Guandu (ES,) with Samarco’s support in the supply of material and technical knowledge concluded the Adductor Project of the Water Treatment Facility of the Guandu River. Three adductors were installed at the location as a prevention to allow the supply of water without interruption. The tests of the new Water Treatment Plant ended this Sunday and were approved by SAAE.